Rayo is delivering a standardised fleet of around 20 battery energy storage systems across South Australia — each ≤5 MW / 4-hour (≈20 MWh), connected at 33 kV to the SA Power Networks distribution network. Stage 1 is deliberately engineered for repeatability and is the template for a national build-out to follow.
The programme is delivered end-to-end within Rayo’s integrated model: Shift Energy originates and matures each site (land, connection, planning, offtake), Rayo Construction Services self-performs the engineering, civil, electrical, HV testing, commissioning and grid connection, and Rayo Maintenance Services operates the fleet. A single accountable partner across develop–build–operate removes the interface risk that typically erodes value in distributed BESS programmes.